Gravel Road Construction Quotes

Get Professional Services

Cost of Gravel Road Construction in Hayden

Gravel road construction in Hayden, ID, is a vital infrastructure project that requires careful planning and budgeting. The cost can vary significantly based on a range of factors, from the quality of materials used to the specific requirements of the project. Understanding these variables can help in estimating the overall expenses and ensuring a successful construction process.

Factors Influencing Costs

  • Material Quality: Higher-quality gravel and other materials can increase costs but offer better durability.
  • Labor Rates: Local labor costs in Hayden, ID, can impact the overall budget.
  • Road Length and Width: Longer and wider roads require more materials and labor, thus increasing costs.
  • Terrain: Hilly or rocky terrain can complicate construction and raise expenses.
  • Drainage Requirements: Proper drainage systems are essential and can add to the cost.
  • Permits and Regulations: Compliance with local regulations can involve additional fees.
  • Equipment Rental: The cost of renting construction equipment can vary based on the duration and type of machinery needed.

Average Costs for Common Tasks

Task Average Cost (Hayden, ID)
Gravel Material (per ton) $15 - $30
Labor (per hour) $25 - $50
Grading (per mile) $3,000 - $5,000
Drainage Installation $1,000 - $3,000
Compaction (per mile) $1,500 - $3,000
Permits and Fees $500 - $1,500
Equipment Rental (daily) $200 - $500

Gravel Road Construction